Engineer’s Report
Official Roll-Call Vote
Staff Report & Agenda Item Details
Engineer’s Report. President Berry recognized Ms. Wehlmann, who presented to and reviewed with the Board the Engineer’s Report. Ms. Wilkinson reported on the Water Plant No. 1 Rehabilitation. She stated that in 3 coordination with Inframark, the contractor took down Water Plant No. 1 to install the proposed 20-inch gate valve and replace the 16-inch gate valve necessary for the isolation of GST No. 1 and later GST No. 2. She noted that the contractor has started blasting the exterior piping, the interior of GST No. 1 and has placed the stripe coating on the hydropneumatics tanks. She reported that IDS received and approved the quantities billed in Application and Certificate for Pay Application No. 2. She stated that the central vent on GST No. 1 was removed in preparation for the tank rehabilitation items and that once removed, IDS noted the accelerated deterioration of the center support structure and the outer rafter supports. She reported that IDS’ direction, the contractor spot bl
Bastiat Liberty & Property Rights Analysis
This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 2.3/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.