YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
11.F • Action ItemsBRYAN ISD (Brazos County)

Consideration of and possible action on a proposed contract with GLS Architecture-Engineering-Surveying to provide design and construction administration services for the restroom finish improvements identified in the 2025 Bond Presenter: Deputy Superintendent, Dr. Brian Merrell Attachments: ( 1 ) B101-2017 - Elementary Remodel - GLS PBH 04.10.26 - Signed

Presented in: BRYAN ISD Board of Trustees Regular Meeting on 2026-04-20
Meeting Agenda PDF

Official Roll-Call Vote

Expands Gov't • 9.0/10 Impact Weight
PASSED (7 - 0)
“Action on Consideration of and possible action on a proposed contract with GLS Architecture-Engineering-Surveying to provide design and construction administration services for the restroom finish improvements ”
DJ
Dr Julie Harlin
Trustee, Place 5 (Place 5)
YES
DS
David Stennis
Trustee, Place 6 (Place 6)
YES
RW
Ruthie Waller
Trustee, Place 7 (Place 7)
YES
DS
David Stasny
Trustee, Place 1 (Place 1)
YES
FB
Felicia Boxley
Trustee, Place 2 (Place 2)
YES
JB
Joel Bryan
Trustee, Place 3 (Place 3)
YES
LG
Leo Gonzalez, Ii
Trustee, Place 4 (Place 4)
YES

Staff Report & Agenda Item Details

11.F. Consideration of and possible action on a proposed contract with GLS Architecture-Engineering-Surveying to provide design and construction administration services for the restroom finish improvements identified in the 2025 Bond Presenter: Deputy Superintendent, Dr. Brian Merrell Attachments: ( 1 ) B101-2017 - Elementary Remodel - GLS PBH 04.10.26 - Signed

Bastiat Liberty & Property Rights Analysis

This motion is scored as EXPANDS_GOVERNMENT (Impact Weight: 9.0/10). Under the Bastiat Liberty Watchdog Index, measures that increase tax rates or fee schedules, issue new debt or Certificates of Obligation, expand regulatory/zoning restrictions on private land use, or authorize unbudgeted spending expansions reduce an official's Freedom Score when voted YES (and reward dissenting NO votes).