Consider and Approve the Proposal for the Track Resurfacing Substructure Repair Presenter: Superintendent, Wayne Bennett Description: This Proposal for in the amount of $35,471.00, includes installing the below-referenced track and field surfacing system over an acceptable receiving surface (existing or by others) including material, labor and freight in accordance with the manufacturer's specific
Official Roll-Call Vote
Staff Report & Agenda Item Details
III.C. Consider and Approve the Proposal for the Track Resurfacing Substructure Repair Presenter: Superintendent, Wayne Bennett Description: This Proposal for in the amount of $35,471.00, includes installing the below-referenced track and field surfacing system over an acceptable receiving surface (existing or by others) including material, labor and freight in accordance with the manufacturer's specifications. Single Mobilization All lane lines and event markings per NFHS rules and regulations New or patched asphalt or concrete receiving surface be allowed to cure for 28 days depending on surface type Prevailing wage rates
Bastiat Liberty & Property Rights Analysis
This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 2.0/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.