YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
7 • FINANCEMiddle Pecos Groundwater Conservation District (Pecos County)

Consider and/or act upon Treasurer’s Report for the Month Ending August 31,

Presented in: Middle Pecos GCD Board Meeting - 2020-09-15 on 2020-09-15
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (4 - 0)
“. General Manager Edwards presented the financials to the Board. After discussion Ronnie Cooper made a motion to approve the Treasurer's Report for the Month Ending August 31, 2020. Motion seconded by Vanessa Cardwell. Motion passed. Vote: 8 FOR”
MR
M. R. Gonzalez
Director, Precinct 1 Place 1 (Precinct 1 Place 1)
YES
WT
Wayne Tinkler
Director, Iraan Representative (Iraan Representative)
YES
PB
Puja Boinpally
Director, Precinct 1 Place 2 (Precinct 1 Place 2)
ABSENT
LD
Larry Drgac
Director, Precinct 2 Place 2 (Precinct 2 Place 2)
ABSENT
JS
Jeff Sims
Director, Precinct 3 Place 2 (Precinct 3 Place 2)
YES
VC
Vanessa Cardwell
Director, Precinct 4 Place 2 (Precinct 4 Place 2)
YES

Staff Report & Agenda Item Details

Consider and/or act upon Treasurer’s Report for the Month Ending August 31, 2020. General Manager Edwards presented the financials to the Board. After discussion Ronnie Cooper made a motion to approve the Treasurer's Report for the Month Ending August 31, 2020. Motion seconded by Vanessa Cardwell. Motion passed. Vote: 8 FOR. -0- Oppose 3 Absent Update on FSH-MPGCD Joint Study and Implementation. General Manager Edwards updated the Board to report that the Joint Study was approved, the agreement has been signed, and we have received the funds. Our new fiscal year is starting October 15; therefore, Jim Burton will be here the week of October 12" and we will go out to all the sites and start removing the old equipment and installing the downhole portion of the telemetry equipment in the eleven Threshold Wells associated with the Joint Study. Each site will be checked for cellular or satellite service to begin preparing for equipment installation the following month. ————zzz——————————— Minutes of September 15, 2020 Page 2 of 4 Vil Vill Update on Groundwater Model and Management Zone 1 Historical Pumping Estimates. General Manager Edwards gave a brief introduction on the work completed on the 3D geologic and groundwater flow models. Vince Clause and Michelle Sutherland, consultants for the District, gave a detailed update and 3D movie preview on the new defined Management Zone 1 update to the 3D geological model. The PowerPoint presentation presented at the meeting is attached as attachment A. Dr. Bill Hutchison gave an update on historical groundwater production estimates from 2008 to 2018 based on District records and presented several graphs comparing historical groundwater production estimates to current Groundwater Models. He indicated that all this information is critical to the development of the groundwater flow model that is being developed by the District. A tech memo will be created for each of the components for the groundwater flow model and the District will receive comment on each phase of the development. The pumping estimates presentation is attached as attachment B. Dr. Robert Mace spoke during this item and discussed some of his work on pumping estimates in his draft report associated with Comanche Springs. Dr. Mace went over his simple “Bathtub Model” and reported, in his estimate, if pumping in the Leon Belding area is above 49,000 acre feet a year spring flow will be nonexistent and pumping below 49,000 acre feet a year will produce winter spring flow in Comanche Springs. Dr. Mace did elaborate that in his estimates to produce year round flow at Comanche Springs of 10 — 20 cfs, pumping in the Leon Belding area would need to be 25,000-36,000 acre feet a year. He estimated that 50% of current pumping would need to be reduced to restore Comanche Springs to year round flows. Briefing and take action as necessary on Cockrell Investment Partners, L.P. v. Middle Pecos Groundwater Conservation District, Cause No. P-12176-112- CV (Pecos County District Court). MPGCD Attorney Mike Gershon reminded the Board that an upcoming hearing is set before Judge Ables on November 12" on the District's plea to the jurisdiction and FSH’s plea to the jurisdiction. Mike Gershon recommended that the Board go into executive session before adjourning to discuss this case as authorized by law under the Texas Open Meetings Act section 551.071. Progress Reports: Well Registrations, Production Permits, Drilling Permits, Data Loggers, Drought Monitor Map, Water Quality Analysis and General Manager’s Correspondence. Drought Map was provided in the Board Packet. Pecos County is in Extreme Drought as of 09-08-2020. Update on PCWCID#1 USDA Grant Funding and system update. Region F Water Planning Group Meeting set for September 17, 2020. GMA 7 meeting scheduled for September 16, 2020 at the Sonora Caverns. rr Minutes of September 15, 2020 Page 3 of 4 Xl Texas Water Trade has a Request for Proposals: Ag Producer Outreach for

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.