Back to Docket Search
11.G • Action ItemsBRYAN ISD (Brazos County)
Consideration of and possible action on a proposed contract with SZS Architecture to provide design and construction administration services for the restroom finish improvements identified in the 2025 Bond Presenter: Deputy Superintendent, Dr. Brian Merrell Attachments: ( 1 ) B101-2017 - Bowen Elem and Intermediate Restroom Finish - SZS PBH 04.10.26 - Signed
Presented in: BRYAN ISD Board of Trustees Regular Meeting on 2026-04-20
Official Roll-Call Vote
Restrains Gov't • 9.0/10 Impact Weight
PASSED (7 - 0)
“Action on Consideration of and possible action on a proposed contract with SZS Architecture to provide design and construction administration services for the restroom finish improvements identified in the 2025”
DJ
Dr Julie Harlin
Trustee, Place 5 (Place 5)
YES
DS
David Stennis
Trustee, Place 6 (Place 6)
YES
RW
Ruthie Waller
Trustee, Place 7 (Place 7)
YES
DS
David Stasny
Trustee, Place 1 (Place 1)
YES
FB
Felicia Boxley
Trustee, Place 2 (Place 2)
YES
JB
Joel Bryan
Trustee, Place 3 (Place 3)
YES
LG
Leo Gonzalez, Ii
Trustee, Place 4 (Place 4)
YES
Staff Report & Agenda Item Details
11.G. Consideration of and possible action on a proposed contract with SZS Architecture to provide design and construction administration services for the restroom finish improvements identified in the 2025 Bond Presenter: Deputy Superintendent, Dr. Brian Merrell Attachments: ( 1 ) B101-2017 - Bowen Elem and Intermediate Restroom Finish - SZS PBH 04.10.26 - Signed
Bastiat Liberty & Property Rights Analysis
This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 9.0/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.