YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
9 • REGULARIrving Flood Control District Section #3 (Dallas County)

VALLEY RANCH ASSOCIATION INTERFACES

Presented in: Board of Directors Regular Meeting - June 16, 2025 on 2025-06-16
Meeting Agenda PDF

Staff Report & Agenda Item Details

Mr. Miller was in attendance. Mr. Miller had a couple of questions that he was relaying from VRA which was with the recent rainstorm, there was some overspilling of water out of the canals, which residents thought the pumps were delayed on being activated. Mr. Benefiel and Mr. Burke commented that the amount of water that was falling was faster than the pumps could pump out, that it is normal for that to happen for a short time when water is falling so quickly, water levels did go back down. All 5 pumps were in use. The concern for VRA is the erosion plantings that were plated earlier could potentially be destroyed with all the water overflowing. The second question was regarding mowing a strip of grass between the Ledbetter Sump project, which will be addressed.