Back to Docket Search
The Operational Report was presented by T J Riggio. He informed the Board that the
Presented in: Board of Directors Regular Meeting - June 17, 2026 on 2026-06-17
Staff Report & Agenda Item Details
The Operational Report was presented by T J Riggio. He informed the Board that the flow meter at WWTP No. 1 is not reading correctly, reading approximately half of what it should be. The crews have followed the manufacturer instructions, will be contacting the manufacturer to have them come check out the meter. T. Riggio reported the pump was replaced at Lift Station 18 in Pecan Plantation.