YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
2 • WATER_PERMITSBrazos Valley Groundwater Conservation District (Brazos County)

Discussion and possible action on the following Operating Permit Amendment

Presented in: Approved Minutes | Public Rules Hearing, Permit Hearing & Regular Board Meeting | August 8, 2024 on 2024-08-08
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (7 - 0)
“A motion was made by Lisa Rolke, second by Chris Zeig for approval an amendment to two (2) existing Operating permits for CSWR - Texas Utility Operating Company increasing the maximum production rate of the wells from 60 gpm to 115 gpm as presented to Board. The motion passed unanimously.”
CZ
Chris Zeig
Director, Robertson County (Municipal) (Robertson County (Municipal))
YES
JB
Jayson Barfknecht
Director, Brazos County (Agricultural) (Brazos County (Agricultural))
YES
LR
Lisa Rolke
Director, Brazos County (College Station) (Brazos County (College Station))
YES
SC
Stephen Cast
Director, Brazos County (Bryan) (Brazos County (Bryan))
YES
GM
Gary Mechler
Director, Robertson County (Agricultural) (Robertson County (Agricultural))
YES
JK
Jeff Kennedy
Director, Brazos County (Rural Water) (Brazos County (Rural Water))
YES
MC
Mark Carrabba
Director, Robertson County (Industrial) (Robertson County (Industrial))
YES

Staff Report & Agenda Item Details

Discussion and possible action on the following Operating Permit Amendment Application: • Two (2) existing Operating permits for CSWR - Texas Utility Operating Company: Well #1 (BVHU-0302 & BVOP-0134) Located at: N 31.34861389° W 96.34220278° 2.82 miles NE of the intersection of FM 937 and Sterling Robertson Dam Road in Robertson County. Total maximum annual production from the water well is 40.32 ac­ ft/yr at a maximum rate of 60 gpm for Retail Public Water Supply use. Permit holder seeks to amend the existing permits increasing the maximum production rate of the well from 60 gpm to 115 gpm. No additional water production is being requested. The well produces from the Simsboro Aquifer. A motion was made by Lisa Rolke, second by Chris Zeig for approval an amendment to two (2) existing Operating permits for CSWR - Texas Utility Operating Company increasing the maximum production rate of the wells from 60 gpm to 115 gpm as presented to Board. The motion passed unanimously.

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.