1 • OPERATIONSSienna Plantation Municipal Utility District #1 (Fort Bend County)

Maintenance & Repairs:  Wastewater Treatment Plant i. Wired up and tested membrane washer. ($2,286.47) ii. Purchased and replaced the transducer that failed in the EQ basin. ($1,886.48)  Lift Station i. Trammel Fresno L12- The Subcontractor repaired the

Presented in: Sienna Plantation MUD #1 Board Meeting - 2025-03-27 on 2025-03-27
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (5 - 0)
“Motion to approve Maintenance & Repairs:  Wastewater Treatment Plant i. Wired up and tested membrane washer. ($2,286.47) ii. Purchased and replaced the transducer that failed in the EQ basin. ($1,886.48)  Lift Station i. Trammel Fresno L12- The Subcontractor repaired the”
CB
Carl Bowles
Director, Place 1 (Place 1)
YES
JC
James Condrey
Director, Place 2 (Place 2)
YES
KD
Kelly D. Shipley
Director, Place 3 (Place 3)
YES
JF
James Feuerbach
Director, Place 4 (Place 4)
YES
RB
Robbie Bates
Director, Place 5 (Place 5)
YES

Staff Report & Agenda Item Details

Maintenance & Repairs:  Wastewater Treatment Plant i. Wired up and tested membrane washer. ($2,286.47) ii. Purchased and replaced the transducer that failed in the EQ basin. ($1,886.48)  Lift Station i. Trammel Fresno L12- The Subcontractor repaired the generator to stop an oil leak. ($3,691.79) ii. Sienna Springs L11- Pulled lift pump #2 to remove debris. Made repairs to the check valve for pump #2. ($1,026.42)  Water Distribution i. Murry Ct- Purchased and replaced yard light that was out and replaced bad receptacle. ($757.18) ii. Murry Ct- Set up voltage recorder due to breakers tripping. Collected data for 60 days and found no issues. Whatever was happening on the incoming power was resolved, and no more issues found. iii. Sienna Springs- Excavated down to main and replaced 16in the failed section of the line. Ahd to use vacuum truck to clear off debris on valve risers. Backfilled and cleaned the area. iv. 1833 Sienna Parkway- Relocated non-potable meter.  Sanitary Sewer Collection i. Nothing to report.  Storm Sewer i. Star Pond televised the storm line on Sienna Parkway to find the source of the pond leak. No issues were found in the storm line. ($2,582.60)  Reuse System i. Installed a new non-potable meter on the system. ($4,940.00)

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.