Maintenance & Repairs: Wastewater Treatment Plant i. Picked up waste pump #2 from the shop and reinstalled. ($5,993.96) ii. Cleaned up the spill from the crack that formed in the wall. The contractor made the repairs under warranty. ($3,061.98) Lift S
Official Roll-Call Vote
Staff Report & Agenda Item Details
Maintenance & Repairs: Wastewater Treatment Plant i. Picked up waste pump #2 from the shop and reinstalled. ($5,993.96) ii. Cleaned up the spill from the crack that formed in the wall. The contractor made the repairs under warranty. ($3,061.98) Lift Station i. All locations- Subcontractor completed infrared surveys at all locations. ($2,803.00) ii. Waters Lake L7- Made repairs to pumps and rails. Pulled we well and had to pump down and paid rental cost on bypass pumps. List station is currently running on two pumps, with a bypass pump as a standby. ($48,833.79) iii. Steep Bank L9- Picked up pump #2 from the shop and reinstalled. Returned rental. ($11,888.16) iv. Steep Bank L9- Primary controller was not operating properly. Reprogrammed and set points. Replaced 2 of the floats, tested, and put them back online. ($2,414.50) Water Distribution i. Nothing to report. Sanitary Sewer Collection i. Nothing to report. Storm Sewer i. Nothing to report. Reuse System i. Nothing to report. Renewal and Replacement i. Nothing to report.
Bastiat Liberty & Property Rights Analysis
This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.