YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
1 • OPERATIONSSienna Plantation Municipal Utility District #1 (Fort Bend County)

Maintenance & Repairs:  Wastewater Treatment Plant i. Waters Lake- Repaired faulty VFD on blower motor and replaced communication wire. ($1,784.80) ii. Ordered replacement filters for MBR blowers. ($1,721.45) iii. Jet truck washed down the drum screen so

Presented in: Sienna Plantation MUD #1 Board Meeting - 2026-06-25 on 2026-06-25
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (5 - 0)
“Motion to approve Maintenance & Repairs:  Wastewater Treatment Plant i. Waters Lake- Repaired faulty VFD on blower motor and replaced communication wire. ($1,784.80) ii. Ordered replacement filters for MBR blowers. ($1,721.45) iii. Jet truck washed down the drum screen so”
CB
Carl Bowles
Director, Place 1 (Place 1)
YES
JC
James Condrey
Director, Place 2 (Place 2)
YES
KD
Kelly D. Shipley
Director, Place 3 (Place 3)
YES
JF
James Feuerbach
Director, Place 4 (Place 4)
YES
RB
Robbie Bates
Director, Place 5 (Place 5)
YES

Staff Report & Agenda Item Details

Maintenance & Repairs:  Wastewater Treatment Plant i. Waters Lake- Repaired faulty VFD on blower motor and replaced communication wire. ($1,784.80) ii. Ordered replacement filters for MBR blowers. ($1,721.45) iii. Jet truck washed down the drum screen so repairs could be made. ($861.58) iv. Subcontractor cut down and removed dead trees between the facility fence and homes. ($7,606.50) v. Subcontractor replaced valves for the MBR CIP process. Required welding of valves into stainless piping. ($15,840.00) vi. Vactor removed debris and washed down the wet well. ($5,697.32) vii. Vactor cleaned out the empty drum screen channel to remove build-up and prevent odor. ($1,486.48) viii. Purchased and replaced breaker for AC unit in MCC building #2. ($2,958.80) ix. Subcontroctor serviced both AC units in the control rooms. ($5,697.32)  Lift Station i. Trammel Fresno L12- Replaced bad floats and wired into alarm unit. Tested and put back online. ($4,328.61) ii. Trammel Fresno L12- Removed the old control panel AC unit that had failed and replaced it with a new one. ($10,659.89) iii. Sienna Parkway L2- Ran conduit and installed a new outlet for odor control injection pump. ($2,262.45) iv. Water Lake L7, Sienna Parkway L2, Scanlan Trace L6- Load tested generators in preparation for hurricane season. ($3,022.60) v. Sienna Parkway L2, Scanlan Trace L5, Steep Bank L9, Bees Creek, Brushy Lake L14, Sienna Springs L11- Vactor cleaned out wet well of grease and debris. ($9,900.28)  Water Distribution i. Performed preventive maintenance on the entire disinfection system at all locations. ($7,328.34) ii. Sienna Parkway- Replaced site glass on HPT that was faded and unreadable. ($1,142.63)

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.