1 • OPERATIONSSienna Plantation Municipal Utility District #1 (Fort Bend County)

Maintenance & Repairs:  Wastewater Treatment Plant i. Vactor cleaned out wet well of grease and debris. ($1,930.45) ii. Replaced hoses and fittings on bleach tank. ($1,047.92) iii. Disassembled and cleaned out check valves on onsite lift stations. ($2,33

Presented in: Sienna Plantation MUD #1 Board Meeting - 2025-09-25 on 2025-09-25
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (5 - 0)
“Motion to approve Maintenance & Repairs:  Wastewater Treatment Plant i. Vactor cleaned out wet well of grease and debris. ($1,930.45) ii. Replaced hoses and fittings on bleach tank. ($1,047.92) iii. Disassembled and cleaned out check valves on onsite lift stations. ($2,33”
CB
Carl Bowles
Director, Place 1 (Place 1)
YES
JC
James Condrey
Director, Place 2 (Place 2)
YES
KD
Kelly D. Shipley
Director, Place 3 (Place 3)
YES
JF
James Feuerbach
Director, Place 4 (Place 4)
YES
RB
Robbie Bates
Director, Place 5 (Place 5)
YES

Staff Report & Agenda Item Details

Maintenance & Repairs:  Wastewater Treatment Plant i. Vactor cleaned out wet well of grease and debris. ($1,930.45) ii. Replaced hoses and fittings on bleach tank. ($1,047.92) iii. Disassembled and cleaned out check valves on onsite lift stations. ($2,332.00) iv. Jet truck washed down dumpster pads and cleared drains. ($1,703.73) v. Subcontractor made repairs and received the AC unit in the MCC building. ($7,278.80)  Lift Station i. Sienna Spring L11- Replaced chemical feed pumps for odor control system. ($2,896.95) ii. Waters Lake L4- Made repairs to the generator fuel feed and replaced worn parts. ($577.35) iii. Steep Bank L9- Made adjustments to VFD setting as breakers kept tripping on pump #1: pulled pump and cleared debris. Put back online. ($1,295.21) iv. Steep Bank L9- Pulled pump #2 and took into shop for repairs. Installed rental pump. ($1,508.56) v. Steep Bank L9- Purchased and replaced lifting chains on all pumps. ($1,825.19) vi. Performed preventive maintenance on portable generators. ($937.29) vii. Waters Lake L7- Pulled pumps #1 and #2 and removed debris. Performed confined space entry and made repairs to rails and replaced broken mounting brackets. ($2,708.58) viii. Sienna Parkway L2- Replaced bad level floats in the wet well. ($840.40) ix. Sienna Springs L11- Replaced bad check valve on pump #1. ($5,400.12)  Water Distribution i. Sienna Parkway WP1- Replaced fuel line to generator and plumbed in temporary tank. The old tank had corroded, contaminating the fuel. Tested and put back online. All are to be replaced in an engineering project. ($3,236.31) ii. Sienna Parkway WP1- PLC technician replaced a bad communication board at the plant for the remote well. ($2,451.08)

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.