Report on Construction Projects Including Authorization to Advertise, Bids, Award of Contracts, Estimates, and Change Orders: Langford is proceeding with design for construction of a replacement of the East ground storage tank. Surveying has been complete
Official Roll-Call Vote
Staff Report & Agenda Item Details
Report on Construction Projects Including Authorization to Advertise, Bids, Award of Contracts, Estimates, and Change Orders: Langford is proceeding with design for construction of a replacement of the East ground storage tank. Surveying has been completed. Geotechnical testing is complete. We are designing based on a smaller capacity tank. The Current tank is 420,00 gallons and we are proposing a 310,000-gallon tank. This will save costs and still meet the minimum 200 gallons per ESFC per TCEQ requirements. The tank will be 24 feet tall which is the same height as the existing tanks. We Have submitted the design plans to City of Houston and TCEQ. We are awaiting responses. O:\Curren1 Pro1ects\22 1 _lnvemess Forest\22 t - Engineer's Report\2022 03 08 M UD 44 Engineers Repon .docx Page I 1 Page 43
Bastiat Liberty & Property Rights Analysis
This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 4.8/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.