Maintenance & Repairs: Wastewater Treatment Plant i. Purchased a new flow meter that failed in the EQ basin and installed it. Tested and put back online. ($10,817.25) ii. PLC technician reprogrammed the keypad as blower #2. ($1,683.90) Lift Station i.
Official Roll-Call Vote
Staff Report & Agenda Item Details
Maintenance & Repairs: Wastewater Treatment Plant i. Purchased a new flow meter that failed in the EQ basin and installed it. Tested and put back online. ($10,817.25) ii. PLC technician reprogrammed the keypad as blower #2. ($1,683.90) Lift Station i. Waters Lake L4, Brushy Lake L14, Scanlan L13- Renewed annual alarm service contract. ($1,359.39) ii. Sienna Ranch L12- Purchased and replaced check valves on pumps. ($7,901.61) Water Distribution i. Murray Ct WP1- Replaced bad fuel lines on generator that started leaking. ($3,913.88) ii. Murray Ct WP1- Purchased and replaced the air compressor as the old unit was not economical to repair. ($6,986.81) iii. McKeever WP2- Subcontractor installed surge protection on the remote well to protect the motor. ($17,856.00) iv. Preformed preventive maintenance on all generators and rotating equipment. (Base fee) v. Sienna Springs and Leafwing- Excavated down to the main and replaced the damaged hydrant. Backfilled and cleaned the area. Replaced landscaping after the repair. ($9,526.79) vi. Subcontractor inspected all hydrants within the district. ($4,230.00) Sanitary Sewer Collection i. Nothing to report. Storm Sewer i. Nothing to report. Reuse System i. Nothing to report.
Bastiat Liberty & Property Rights Analysis
This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.