Maintenance & Repairs: Wastewater Treatment Plant i. Repaired leak on Cl2 booster pump discharge line. ($564.61) ii. The vacuum truck washed down the headworks and removed debris. ($2,960.28) iii. Made repairs to chutes for the dumpsters. ($1,078.69) iv
Official Roll-Call Vote
Staff Report & Agenda Item Details
Maintenance & Repairs: Wastewater Treatment Plant i. Repaired leak on Cl2 booster pump discharge line. ($564.61) ii. The vacuum truck washed down the headworks and removed debris. ($2,960.28) iii. Made repairs to chutes for the dumpsters. ($1,078.69) iv. Purchased and replaced ball valves on decant lines. ($938.72) Lift Station i. Waters Lake L7- Paid rental for bypass pump. ($7,157.70) Water Distribution i. Performed preventive maintenance on the entire disinfection system at all water plants. ($11,863.66) ii. McMahon and Murray Ct- Subcontractor performed well production testing. ($1,320.00) iii. Murray Ct- Made repairs to the air relief valve on the jockey pump and replaced the base plate to stop the leak. ($1,306.20) iv. Sienna Parkway- Purchased and replaced a leaking check valve. ($2,976.60) v. Scanlan Trace- Purchased and replaced air relief valve. ($3,925.56) Sanitary Sewer Collection i. Nothing to report. Storm Sewer i. Nothing to report. Reuse System i. Nothing to report. Renewal and Replacement i. Trammel Fresno L12- Installed new lift pump #2 and put it back online. ($26,815.79)
Bastiat Liberty & Property Rights Analysis
This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.