1 • OPERATIONSSienna Plantation Municipal Utility District #1 (Fort Bend County)

Maintenance & Repairs:  Wastewater Treatment Plant i. Picked up repaired autosampler and reinstalled. ($2,402.16) ii. Pulled all onsite lift station floats and cleared debris. Found level transducer failed and replaced. ($2,524.50) iii. Vacuum truck clea

Presented in: Sienna Plantation MUD #1 Board Meeting - 2026-05-28 on 2026-05-28
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (5 - 0)
“Motion to approve Maintenance & Repairs:  Wastewater Treatment Plant i. Picked up repaired autosampler and reinstalled. ($2,402.16) ii. Pulled all onsite lift station floats and cleared debris. Found level transducer failed and replaced. ($2,524.50) iii. Vacuum truck clea”
CB
Carl Bowles
Director, Place 1 (Place 1)
YES
JC
James Condrey
Director, Place 2 (Place 2)
YES
KD
Kelly D. Shipley
Director, Place 3 (Place 3)
YES
JF
James Feuerbach
Director, Place 4 (Place 4)
YES
RB
Robbie Bates
Director, Place 5 (Place 5)
YES

Staff Report & Agenda Item Details

Maintenance & Repairs:  Wastewater Treatment Plant i. Picked up repaired autosampler and reinstalled. ($2,402.16) ii. Pulled all onsite lift station floats and cleared debris. Found level transducer failed and replaced. ($2,524.50) iii. Vacuum truck cleaned and washed down headworks and dumpster area. ($3,163.36) iv. Subcontractor pressure-washed the walls of the entire facility, as they were dirty and starting to build up mildew. ($10,120.00) v. Reinstalled drum screen after repairs. ($10,657.68) vi. Purchased and replaced 20 3-inch gaskets on MBR basins #1 and #2. ($6,429.50) vii. Repaired leaking water supply line to the drum screens. ($1,164.59)  Lift Station i. Waters Lake L7- Paid rental for bypass pump. ($6,030.18) ii. Waters Lake L7 and Scanlan L5- Vactor cleaned out wet wells of grease and debris. ($3,126.61)  Water Distribution i. I. McKeever- Found the level transmitter had failed, and poly tubing leaked, causing a short. Replaced the tubing and made repairs to the circuits that failed. ($1,410.79) ii. McKeever- Purchased and replaced elbows and screens on all booster pumps. Also pulled the jockey pump to adjust alignment. ($2,882.99) iii. Murray Ct- Picked up booster pump #1 from the shop after repairs and reinstalled. ($11,678.63) iv. Murray Ct- Purchased supplies and replaced conduit for pump #1. ($880.69) v. Removed and replaced hatches at all locations for internal tank inspections. Rented a compressor to air up all HPT’s. ($4,343.88) vi. Purchased and replaced supply cables for the portable generators. ($2,970.00) vii. McKeever and Murray Ct- Performed preventive maintenance on all rotating equipment. ($1,140.33)

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.