Maintenance & Repairs: Wastewater Treatment Plant i. Vactor cleaned out wet well of grease and debris. ($14,546.32) ii. EQ pump #2 kept tripping the breaker. Tested the pump and found no issues; found the breaker was bad. Purchased a new breaker, instal
Staff Report & Agenda Item Details
Maintenance & Repairs: Wastewater Treatment Plant i. Vactor cleaned out wet well of grease and debris. ($14,546.32) ii. EQ pump #2 kept tripping the breaker. Tested the pump and found no issues; found the breaker was bad. Purchased a new breaker, installed it, and put it back online. ($13,481.26) Lift Station i. Sienna Parkway L2- Removed generator ATS control panel and sent in for service as it had failed. Reinstalled and put back online. ($3,404.37) ii. Sienna Parkway L2- Purchased and replaced the level transducer that failed and the level controller. ($4,608.05) iii. Sienna Springs L11, Waters Lake L4, Scanlan L13, Steep Bank L9, Trammel Fresno L12, Scanlan L13- Vactor cleaned out wet wells of grease and debris. ($10,507.39) Water Distribution i. Sienna Parkway W1- Pulled new wire to GST as there was a short in the wire. Terminated wires and tested and put back online. ($1,580.24) ii. Sienna Parkway W1- Booster pump #1 was not running properly. Found sensor line cracked. Replaced and put back online. ($924.00) iii. McKeever W2- GST #2 was not reading properly. Found transducer had failed and replaced. ($3,641.00) iv. McKeever W2- Picked up booster pump #3 from the shop and reinstalled. ($9,878.00) v. McKeever W2- Purchased and replaced cooling fan for electrical cabinet. ($2,117.50) vi. Performed preventive maintenance on disinfection systems. ($2,721.07) vii. Prepared Consumer Confidence Report and set in certification to TCEQ. ($1,500.00) viii. Installed 6 6-inch riser on a hydrant on Sienna Springs. ($1,505.18) Sanitary Sewer Collection i. Nothing to report.