YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
35 • REGULAR AGENDAWebb County (Webb County)

Discussion and possible action to authorize Task #4 Project Transfer Pump Station Technical Specification in which scope of work will include a professional engineering services assessment with Ardurra Group, Inc. to correct the original operating design points and developing the technical specifications necessary to procure and replace the aging transfer pumps for the Rio Bravo Water Treatment Pl

Presented in: Webb County Commissioners Court - June 22, 2026 on 2026-06-22
Meeting Agenda PDF

Official Roll-Call Vote

Restrains Gov't • 2.8/10 Impact Weight
PASSED (5 - 0)
“Discussion and possible action to authorize Task #4 Project Transfer Pump Station Technical Specification in which scope of work will include a professional engineering services assessment with Ardurra Group, Inc. to correct the original operating design points and developing the technical specifications necessary to procure and replace the aging transfer pumps for the Rio Bravo Water Treatment Pl”

Staff Report & Agenda Item Details

Discussion and possible action to authorize Task #4 Project Transfer Pump Station Technical Specification in which scope of work will include a professional engineering services assessment with Ardurra Group, Inc. to correct the original operating design points and developing the technical specifications necessary to procure and replace the aging transfer pumps for the Rio Bravo Water Treatment Plant. This is pursuant to the Master Service Agreement between Webb County for the Water Utilities Department and Ardurra Group, Inc. (approved on August 25, 2025, Item #27) in the amount of Twelve Thousand One Hundred Sixty Dollars ($12,160.00); authorizing the Webb County Judge to sign all relevant documents and any other matters incident thereto. [Account #1001-1130-001-431007-010 (Operational Reserve)] Issue: The Water Treatment Plant is currently not in regulatory compliance. The original operating design points for the existing transfer pumps at the Water Treatment Plant are inaccurate or inefficient. Additionally, the equipment is aging, which threatens the reliability, flow, and pressure required to meet current and future water demands for local residents. Solution: Authorize Task #4 (Transfer Pump Station Technical Specification) pursuant to the existing Master Service Agreement with Ardurra Group. Result: A comprehensive review will determine the precise operating design points needed to increase plant efficiency. The new pumps will restore reliable flow and pressure, ensuring the plant can safely meet the water demands of Rio Bravo and El Cenizo residents. The potential results of proceeding with the agreement are operational improvements, enhanced compliance requirements with TCEQ, and improve the overall quality and safety of drinking water for residents.

Bastiat Liberty & Property Rights Analysis

This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 2.8/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.