W ater System A
Official Roll-Call Vote
Staff Report & Agenda Item Details
W ater System A. Water Plant No. 1 Improvements 1) Working on drawings for agency review. B . Surface Water Lines & Water Plant Conversions 1) Continuing design. 2) Submitting SWL drawings for review. 3) Working on WP Conversion drawings. C . COH Surface Water Contract 1) Water Supply Supplement from the COH. D . Tank Inspections 1) Preparing bid package for interior coatings for next fall/winter. 2) To be coordinated around other construction projects at WP1 & WP2. E. We ll No. 5 Sinkhole 1) Monitoring. The area sank again. Filling with sand (est. 2-3 CY). 2) Pull column and pump in fall/winter to video casing. 3) The well is 6 years old. It may be worth replacing the pump and column at the same time.
Bastiat Liberty & Property Rights Analysis
This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.