YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
1 • OPERATIONSVarner Creek Utility District (Brazoria County)

Operator’s Monthly report (see overall report) • Bacterial samples taken all samples good • Levy Inspection good • Standby for pumps during storm 6/15-6/16 – stayed overnight • 1 water main break • Support for 12” waterline replacement • Met with NTS for

Presented in: Varner Creek Utility District Board Meeting - 2026-07-15 on 2026-07-15
Meeting Agenda PDF

Official Roll-Call Vote

Routine / Procedural • 0.0 Score Impact
PASSED (6 - 0)
“Motion to approve Operator’s Monthly report (see overall report) • Bacterial samples taken all samples good • Levy Inspection good • Standby for pumps during storm 6/15-6/16 – stayed overnight • 1 water main break • Support for 12” waterline replacement • Met with NTS for ”
AS
Allen Sassin
President
YES
JT
Jody Tielke
Director, Place 3
YES
JS
James Stubbs
Director, Place 4
YES
AN
Amy Neal
Director, Place 5
YES
KB
Keith Barker
Director, Place 1
YES
MH
Mark Hopkins
Director, Place 2
YES

Staff Report & Agenda Item Details

Operator’s Monthly report (see overall report) • Bacterial samples taken all samples good • Levy Inspection good • Standby for pumps during storm 6/15-6/16 – stayed overnight • 1 water main break • Support for 12” waterline replacement • Met with NTS for inspection of 1 sewer pump @ lift station After discussion, Jim Stubbs made a motion to approve $20,000 to repair sewer lift pump #2 and was seconded by Amy Neal and the vote was approved unanimously 5-0 Amy Neal made a motion to approve the overall Operator’s Report and was seconded by Jody Tielke and the vote passed unanimously 5-0.

Bastiat Liberty & Property Rights Analysis

This docket item is classified as NEUTRAL (0.0 Score Impact). Routine administrative reports, monthly accounts payable/disbursement registers, minutes approvals, and procedural motions are logged for public transparency but carry zero weight in calculating an official's Roll-Call Freedom Score.