YDHLGE Logo
YDHLGEYou Don't Hate Local Government Enough
Back to Docket Search
12 • INFRASTRUCTUREArcola Municipal Management District #1 (Fort Bend County)

BACKSLOPE DRAIN INTERCEPTOR STRUCTURES, INCLUDING ALL CORRUGATED GALVANIZED METAL PIPE, SLOPE PAVING WITH REINFORCING STEEL AT INFLOW AND OUTFLOW, RIP RAP, NECESSARY ADAPTORS, JOINTS AND FITTINGS, ETC., SPOILS TO BE HAULED AND PLACED, AND COMPACTED TO 95%

Presented in: Arcola Municipal Management District #1 Board Meeting - 2025-02-12 on 2025-02-12
Meeting Agenda PDF

Official Roll-Call Vote

Restrains Gov't • 2.2/10 Impact Weight
PASSED (5 - 0)
“Motion to approve BACKSLOPE DRAIN INTERCEPTOR STRUCTURES, INCLUDING ALL CORRUGATED GALVANIZED METAL PIPE, SLOPE PAVING WITH REINFORCING STEEL AT INFLOW AND OUTFLOW, RIP RAP, NECESSARY ADAPTORS, JOINTS AND FITTINGS, ETC., SPOILS TO BE HAULED AND PLACED, AND COMPACTED TO 95%”
LF
Len Franklin
Director, Place 3
YES
DR
Donyelle Robinson
Director, Place 4
YES
BC
Brian Cokes
Director, Place 5
YES
ME
Mary Ewing
Director, Place 1
YES
CB
Carrie Bond
Director, Place 2
YES

Staff Report & Agenda Item Details

BACKSLOPE DRAIN INTERCEPTOR STRUCTURES, INCLUDING ALL CORRUGATED GALVANIZED METAL PIPE, SLOPE PAVING WITH REINFORCING STEEL AT INFLOW AND OUTFLOW, RIP RAP, NECESSARY ADAPTORS, JOINTS AND FITTINGS, ETC., SPOILS TO BE HAULED AND PLACED, AND COMPACTED TO 95% STANDARD PROCTOR DENSITY WITH MAXIMUM 8” LIFTS IN FILL AREAS, TO BE APPROVED BY ENGINEER, COMPLETE IN PLACE EA 8 $8,100.00 $64,800.00 $12,442.00 $99,536.00 $15,335.00 $122,680.00 $12,500.00 $100,000.00 1) HURTADO CONSTRUCTION COMPANY 2) TEXAN DIRT, LLC 3) HARRIS CONSTRUCTION COMPANY, LLC 4) RT ELLIS EXCAVATING INC CONSTRUCTION OF THE DETENTION PHASE 1 TO SERVE REVERIE RANCH Page 2 of 22 FRN F-1386 LJA Engineering, Inc. O:\LAND\2890\2104\2.11.25_Detention Ph 1 Reverie Ranch_BT

Bastiat Liberty & Property Rights Analysis

This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 2.2/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.