CLAY FILL FOR LAKE D LINER, MATERIAL TO BE OBTAINED WITHIN LIMITS OF LAKE BOTTOM, (FILLING IN A MAXIMUM 8” LIFTS UNTIL 2’ THICK (MIN.), AND COMPACTION TO 95% STANDARD PROCTOR DENSITY, (CONTRACTOR WILL ONLY BE PAID EXACT QUANTITY CONSTRUCTED), AS DIRECTED
Official Roll-Call Vote
Staff Report & Agenda Item Details
CLAY FILL FOR LAKE D LINER, MATERIAL TO BE OBTAINED WITHIN LIMITS OF LAKE BOTTOM, (FILLING IN A MAXIMUM 8” LIFTS UNTIL 2’ THICK (MIN.), AND COMPACTION TO 95% STANDARD PROCTOR DENSITY, (CONTRACTOR WILL ONLY BE PAID EXACT QUANTITY CONSTRUCTED), AS DIRECTED BY THE ENGINEER, COMPLETE IN PLACE SY 2571 $0.01 $25.71 $0.50 $1,285.50 $2.25 $5,784.75 $1.50 $3,856.50 Page 3 of 22 FRN F-1386 LJA Engineering, Inc. O:\LAND\2890\2104\2.11.25_Detention Ph 1 Reverie Ranch_BT
Bastiat Liberty & Property Rights Analysis
This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 4.4/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.