Back to Docket Search
38 • INFRASTRUCTUREArcola Municipal Management District #1 (Fort Bend County)
OUTFALL STRUCTURE FOR 18” R.C.P. PER DETAIL, INCLUDES 5” CONCRETE SLOPE PAVING WITH 2’ TOE WALL AROUND, RIP RAP, AND ALL OTHER APPURTENANCES, ALL DEPTHS, (TO BE USED ONLY AT THE DIRECTION OF THE ENGINEER), COMPLETE IN PLACE EA 1 $12,888.00 $12,888.00 $2,6
Presented in: Arcola Municipal Management District #1 Board Meeting - 2025-02-12 on 2025-02-12
Staff Report & Agenda Item Details
OUTFALL STRUCTURE FOR 18” R.C.P. PER DETAIL, INCLUDES 5” CONCRETE SLOPE PAVING WITH 2’ TOE WALL AROUND, RIP RAP, AND ALL OTHER APPURTENANCES, ALL DEPTHS, (TO BE USED ONLY AT THE DIRECTION OF THE ENGINEER), COMPLETE IN PLACE EA 1 $12,888.00 $12,888.00 $2,675.00 $2,675.00 $14,750.00 $14,750.00 $7,500.00 $7,500.00 Page 4 of 22 FRN F-1386 LJA Engineering, Inc. O:\LAND\2890\2104\2.11.25_Detention Ph 1 Reverie Ranch_BT