Back to Docket Search
5 • OPERATIONSVarner Creek Utility District (Brazoria County)
Improvements to infrastructure: Consider replacing the main water line out of water plant, modernize the control panels for the storm pumps, replace switch panel at the water plant, and adding a generator at the East Pump Station. Director Sassin made the
Presented in: Varner Creek Utility District Board Meeting - 2023-12-15 on 2023-12-15
Official Roll-Call Vote
Restrains Gov't • 2.1/10 Impact Weight
PASSED (6 - 0)
“Motion to approve Improvements to infrastructure: Consider replacing the main water line out of water plant, modernize the control panels for the storm pumps, replace switch panel at the water plant, and adding a generator at the East Pump Station. Director Sassin made the”
AS
Allen Sassin
President
YES
JT
Jody Tielke
Director, Place 3
YES
JS
James Stubbs
Director, Place 4
YES
AN
Amy Neal
Director, Place 5
YES
KB
Keith Barker
Director, Place 1
YES
MH
Mark Hopkins
Director, Place 2
YES
Staff Report & Agenda Item Details
Improvements to infrastructure: Consider replacing the main water line out of water plant, modernize the control panels for the storm pumps, replace switch panel at the water plant, and adding a generator at the East Pump Station. Director Sassin made the motion to accept the Operator’s Report. The motion was seconded by Director Weeks and the vote was unanimous approval.
Bastiat Liberty & Property Rights Analysis
This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 2.1/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.