D • OPERATIONSVarner Creek Utility District (Brazoria County)

ENGINEER’S REPORT 1 & 2. The start-up was completed on the North Pump Station. The contractor is assembling O&M Manuals. The 36” CIPP project: Storm pipe and flap gate installation is complete. The final inspection with Board members done Friday prior to

Presented in: Varner Creek Utility District Board Meeting - 2022-02-16 on 2022-02-16
Meeting Agenda PDF

Official Roll-Call Vote

Restrains Gov't • 4.4/10 Impact Weight
PASSED (6 - 0)
“Motion to approve ENGINEER’S REPORT 1 & 2. The start-up was completed on the North Pump Station. The contractor is assembling O&M Manuals. The 36” CIPP project: Storm pipe and flap gate installation is complete. The final inspection with Board members done Friday prior to ”
AS
Allen Sassin
President
YES
JT
Jody Tielke
Director, Place 3
YES
JS
James Stubbs
Director, Place 4
YES
AN
Amy Neal
Director, Place 5
YES
KB
Keith Barker
Director, Place 1
YES
MH
Mark Hopkins
Director, Place 2
YES

Staff Report & Agenda Item Details

ENGINEER’S REPORT 1 & 2. The start-up was completed on the North Pump Station. The contractor is assembling O&M Manuals. The 36” CIPP project: Storm pipe and flap gate installation is complete. The final inspection with Board members done Friday prior to the meeting. Final item to be done is remove silt fence and hydro-mulch levee.

Bastiat Liberty & Property Rights Analysis

This motion is scored as RESTRAINS_GOVERNMENT (Impact Weight: 4.4/10). Under the Bastiat Liberty Watchdog Index, voting YES on measures that cap or reduce ad valorem tax burdens, expand taxpayer exemptions, retire debt early, enforce competitive bidding caps, or remove regulatory/zoning barriers to private property rights earns a positive Pro-Liberty score.